Enel X: how much does it cost to occupy the columns after the end of the recharge

Source: HW Upgrade added 16th Oct 2020

Enel X, a company of the Enel Group which provides products and services for energy transformation at home, city and industrial level, represents a crucial resource for the sustainability of electric mobility

by Rosario Grasso published on , at 20: 01 in the Technology channel

It is in the

Without the investments of Enel X no there would be in Italy the conditions for the transition to electric mobility . The company of the Enel Group aims to install up to 28. 00 0 recharging points on the Italian territory only by 2022 confirming the company’s commitment to invest more in our country.

Now announces new methods for discourage the use of the columns when not strictly necessary, adapting to the recent changes introduced to the Highway Code regarding parking of vehicles . Starting from 2 November , in fact, the Highway Code provides for penalty for stops longer than an hour . This time limit does not apply from hours 23 to 7, except for high power charging points.

The additional costs if you occupy the charging column for electric cars for more than an hour

  • for AC sockets (Type2 and Type3a) with power up to 22 kW l ?? charge is 0, 09 ?? / min from Monday to Sunday, including holidays, from 7 am: 00 at 23: 00;
  • for AC sockets (Type2 and Type3a) up to 43 kW, there is a charge of 0, 09 ?? / min from Monday to Sunday, including holidays, from 00: 00 at 24: 00
  • for DC Sockets (CHAdeMO and CCS Combo 2) up to 50 kW charged of 0, 18 ?? / min from Monday to Sunday, including holidays, from 00: 00 at 24: 00
  • for HPC Stations (CHAdeMO and CCS Combo 2) up to 350 kW ?? charge of 0, 18 ?? / min from Monday to Sun enica, including holidays, from hours 00: 00 at 24: 00

Other information on distribution of Enel X columns